Soil Testing
What is the time required for soil or plant analysis?
Generally, it takes 3 to 5 working days to complete a soil analysis through the soil testing laboratory. The turn around time is effected by seasonal sampling and instrument failures.
Soil Testing
- Can samples be taken when soils are wet?
- Fee Schedule
- How many one thousand square feet in an acre?
- How often should I test my soil?
- How should a soil sample(s) be taken?
- How to Collect a Soil Sample
- Interpreting Your Soil Test
- Interpreting Your Soil Test
- Soil Testing
- Submitting a Soil Test to the Lab
- Submitting a Soil Test to the Lab
- What is the time required for soil or plant analysis?
- When is the best time to take soil samples?
- Why is it important to mix lime with the soil?